This project consists of 5.1 miles of elevated guideway for a new light rail system. It includes typical span lengths ranging from 65’ to 150’ and one longer pair of 165’ continuous spans.
The substructure, designed for high seismic demand, consists of single reinforced concrete piers supported on monodrilled shafts. The superstructure is constructed using precast segmental technology with the superstructure erected span-by-span with an overhead gantry.